A refurbishment involving heavy demolition works to an existing reception area within an occupied building with a Grade I listed façade. Works involved the addition of a steel frame on which a new zinc roof was installed. Internally, the walls and floors received a stone finish with new windows installed into the arches within the existing façade.
The mechanical and electrical services were completely stripped back and replaced. Careful consideration had to be given to maintaining the public walkway alongside Victoria Station. Works were completed January 2017.
-
Project
111 Buckingham Palace Road
-
Value
£8.5 million
-
Duration
52 weeks
-
Project Manager
Burnley Wilson Fish
-
Architect
Eric Parry Architects
-
QS
Burnley Wilson Fish
-
Services Consultant
Blyth & Blyth
Managing Director
Jason Warren
Related Projects
Jason Warren
Managing Director
Jason has over 35 years of experience in the construction industry, covering projects from new build and heavy structural refurbishment through to complex Cat A and Cat B fit outs.
Jason joined Collins in 2013 and has been instrumental in developing and growing the reputation of the business. As managing director, Jason will continue to push forward the company's long term goals and ambitions, thereby paving the way for the next generation of leaders.
Jason is a firm believer in building strong, trusting relationships with clients and colleagues to help push the business forward, alongside a team of great people who are proud of the work they do.