This £800,000 CAT A refurbishment consisted of work to 3 different floors; lower ground, 2nd and 3rd floor, as well as common areas such as the reception and the main staircase. A major strip out of the existing offices preceded the installation of mechanical and lighting systems, WC’s, partitions and doors, floor finishes and ceiling grids. The existing windows were also given an overhaul and modifications were made to the electrical systems and floor power outlets.
Working for Aberdeen Asset Management and alongside Bollingbrook and Wish London, the project was completed over the course of 16 weeks.
-
Project
Prospero House, 241 Borough High Street
-
Value
£800,000
-
Duration
16 weeks
-
Project Manager
Bollingbrook
-
Architect
Cann Creative
-
QS
Bollingbrook
-
Services Consultant
GDM
Divisional Director
Duncan Redman
Related Projects
Duncan Redman
Divisional Director
Duncan joined Collins in 2001 and has been a part of, and contributed to, the growth, development and success of the company. Having worked in the industry for over 30 years, Duncan has a wealth of experience and knowledge across a range of project types, from Cat B fit out to cut and carve refurbishment.
Duncan leads a committed, hardworking team who go the extra mile at every level to deliver a successful project. He believes in a hands on approach and management style, and leads his teams by example. He builds strong, honest relationships with clients which as a result, has consistently led to repeat business.