Situated in the heart of Mayfair this £8 million structural refurbishment was completed over the course of 44 weeks. Works included the installation of a new lift shaft, the formation of 41 new dormer windows and the conversion of the existing roof plant into lettable area at Level 7.

The building benefited from new glazing throughout and curtain walling as well as a full Cat A fit out. All floors were fitted with new suspended ceilings, raised access flooring and specialist finishes. The double height reception area was finished with a bespoke desk with alabaster panels.

  • Project

    10 Stratton Street

  • Value

    £8 million

  • Duration

    44 weeks

  • Project Manager

    MHBC

  • Architect

    MHBC

  • QS

    MHBC

  • Services Consultant

    MHBC

Project Director

Alex English

Related Projects

Alex English

Project Director

Alex has recently joined Collins as Project Director, where he is responsible for delivering projects on time and to a high standard, while prioritising health and safety.

He started his career as a carpenter, navigating various operational roles. As a Project Director, he leverages his expertise to address challenges and find innovative solutions that benefit all stakeholders involved in projects.

This website uses cookies to ensure the best possible experience for the user. Please accept or decline. See our cookie policy for more information